Agree the snag list before you take the keys

Don’t take the keys until the snag list is agreed.

Keys to a new home held up at the front door

Handover is your last moment of real leverage. Once you’ve accepted the building, it’s harder to get defects fixed quickly.

Before you accept

  • Walk every room with the contractor and agree a written snag list, with dates to fix.
  • See the systems tested: cooling, water, power and fire alarms.
  • Collect the documents: completion certificates, as-built drawings, manuals and warranties.
  • Note when the defects liability period ends, and hold the retention until then.

Where Lockd comes in

Delivering the handover is the last step of the Lockd Method: testing and commissioning, snagging to close-out, the documents collected, and defects followed through the liability period.