Guides for owners
Most of a building project’s cost, time and quality is decided by a handful of decisions. These guides explain them in plain English.
Building a villa
- The budget comes before the briefMany villa budgets go wrong before a single drawing exists. How to set the brief and the budget so the design stays inside it.
- The renders aren’t the budgetWhy villa tenders often come back far above the early estimate, and how to keep the villa you approved from being value-engineered away.
- Finish the design before you tenderTendering an unfinished design is how villa budgets break. What a finished design means before the contractor prices it.
- Every change has a price and a date“While we’re at it” is an expensive phrase on a building site. How to control changes so the budget and handover date don’t drift.
- Inspect before it’s coveredThe costliest building defects are often the ones you can’t see. How hold points and inspections catch them before they’re covered.
Handover
Income buildings
- The return is decided at Stage 0Much of a residential building’s return is decided before the design starts. How to build a business case that holds up.
- Delay is the cost you don’t seeOn an income building, every month of delay is a month without rent. How to see delay coming and keep claims alive.
- Service charges start on the drawing boardHigh service charges are often fixed by decisions made in design. How to test running costs before the design is signed off.
- Your contractor’s cash is your riskOn a bigger building, your contractor’s finances are your risk too. How to pre-qualify, secure and watch for the warning signs.
How we run projects
- Every stage ends with your sign-offHands off doesn’t mean out of the loop. How stop points and sign-offs keep the owner in control at every stage of a project.
- Every delay gets a numberEvery project meets delays. What matters is recording them properly, early: cause, effect, who carries the risk and the notice deadline.
The stages
- The RIBA Plan of Work stages, explained for ownersThe 8 stages of the RIBA Plan of Work 2020 in plain English: what happens in each, what you sign off as the owner, and when your contractor joins.
- Stage 0: should you build at all?Stage 0 of the RIBA Plan of Work is where you decide whether to build at all. What happens, and what you sign off.
Talk to us before you appoint anyone.
A 30-minute discovery call, with no obligation. Tell us what you’re planning and where things stand.