Each unit needs its own inspection, snag list and sign-off, and so do the common areas, the plant and the systems.
How to avoid a messy handover
- Use one standard snagging checklist for every unit.
- Log every defect in a register, with an owner and a date to fix.
- Test and commission the systems before units are released.
- Hand the building manager complete documents: as-built drawings, manuals and warranties.
Where Lockd comes in
We run handover as a project of its own: one standard for every unit, a defects register with owners and dates, and complete documents for the building manager.