60 apartments, 60 handovers

Handing over 60 apartments means 60 handovers.

Keys to a new home held up at the front door

Each unit needs its own inspection, snag list and sign-off, and so do the common areas, the plant and the systems.

How to avoid a messy handover

  • Use one standard snagging checklist for every unit.
  • Log every defect in a register, with an owner and a date to fix.
  • Test and commission the systems before units are released.
  • Hand the building manager complete documents: as-built drawings, manuals and warranties.

Where Lockd comes in

We run handover as a project of its own: one standard for every unit, a defects register with owners and dates, and complete documents for the building manager.