The things that usually slip on a building project are time, cost, quality and accountability. The Lockd Method agrees them, locks them into a baseline from day one, and tracks them through to handover. It’s our way of working on every project, aligned with the RIBA Plan of Work 2020.
| Step | What you get | RIBA stages |
|---|---|---|
| Lock the brief | Goals, budget, programme and quality benchmark agreed and signed off before anyone is appointed | 0–1 |
| Onboard the right team | Consultants and contractors vetted for this project’s type and scale, registered and classified for the work, appointed on contracts we’ve checked | 1–4 |
| Control delivery | Cost, time and quality tracked against the baseline; variations challenged; work inspected | 5 |
| Keep you informed | Plain-English status reports, a live risk and decision log, clear options when a decision is yours | Every stage |
| Deliver the handover | Testing and commissioning, snagging to close-out, as-built drawings, manuals and warranties, defects followed through the liability period | 6–7 |
Your sign-off at every stage
Every stage ends at a stop point. The next stage doesn’t open until the stage’s required documents are in, we’ve asked for your sign-off with the evidence attached, and you’ve approved it. If you don’t approve, it comes back to us with your comments.
Why the K is green
On a project report, green means on track. The K in our name stands for Keep you informed: the one thing we do at every stage, so you always know where your project stands.
What we are, and what we aren’t
We are your Client Representative. We represent you through the whole project and manage the team for you. We aren’t the designer, the contractor or a certifying engineer. Consultants and contractors are each responsible for their part; Lockd is accountable for the whole, and answers only to you.