If the design isn’t finished when the contractor prices it, every missing detail becomes a variation later, priced when you have the least leverage.
How to avoid it
- On a traditional route, finish the technical design before tender.
- Specify the finishes: a brand and range, or a defined allowance, not “to the client’s choice”.
- Keep provisional sums few, and clearly defined.
- Coordinate the architect’s and engineers’ drawings before pricing, not on site.