Building a villa

The renders aren’t the budget

It’s a familiar story in villa building.

Floor plans on a desk with drafting pens, a ruler and tape

You approve a beautiful design and an early estimate, the drawings go out to tender, and the prices come back far higher.

What follows is value engineering: finishes downgraded, features cut and details simplified until the price fits. The villa that gets built is often not the one in the renders.

How to avoid it

  • Get a cost plan at concept stage, not after tender.
  • Check it at every stage as the design develops.
  • Make a construction budget part of the designers’ brief.
  • Sign off each stage against the budget, not just the look.

Where Lockd comes in

We make the budget part of the brief and check the design against it at every stage, so the tender confirms the price rather than surprising you.

Read next: Villa construction project management, on your side

Talk to us before you appoint anyone.

A 30-minute discovery call, with no obligation. Tell us what you’re planning and where things stand.