The stages

Stage 0: should you build at all?

Stage 0 is where you decide whether to build at all.

A pencil and scale rule on a construction drawing

Stage 0 of the RIBA Plan of Work is Strategic Definition. Nothing is designed yet. The question is whether a building project is the right answer to your need.

What happens

  • Your requirements are written down.
  • A business case compares the options, with their risks and budgets.
  • Possible sites are appraised.

What you sign off

Your requirements, and the decision to go ahead. Changes cost least now, before anything is drawn.

Where Lockd comes in

The Lockd Method starts here: locking the brief is the work of Stages 0 and 1, before anyone is appointed. For all 8 stages, see the RIBA Plan of Work stages, explained.

Read next: The Lockd Method

Talk to us before you appoint anyone.

A 30-minute discovery call, with no obligation. Tell us what you’re planning and where things stand.