Inspect before it’s covered

The costliest villa defects are often the ones you can’t see.

An inspector walking the reinforcement steel before the concrete pour, seen from above

Waterproofing under tiles, pipework inside walls, steel inside concrete. Once it’s covered, a defect is costly to find and costlier to fix.

How to avoid it

  • Agree hold points in the contract: stages where work stops until it’s inspected.
  • Inspect waterproofing before screeds and tiles, and services before ceilings close.
  • Record each inspection with photos and a sign-off.
  • Make sure your consultant’s appointment states its site visits and inspections.

Where Lockd comes in

We make sure the right inspections happen at the right time, and that each one is recorded, so problems are found while they’re still cheap to fix.